Atlas — pause or continue?
2 messages · guided mode
Should we pause Atlas given the SPYN load?
Pause for two sprints. The risk register flags reputational cost as low and resource freedom as high. I'll prep the pause memo for the board.
Prototype
Reply input is mocked — production lets you continue the thread.